From agreement information to adoption handover
Use this practical checklist to organise the documents, construction evidence and close-out information commonly needed on a sewer adoption scheme.
Overview
Ofwat describes sewerage adoption agreements as the route used when a developer or self-lay provider wants the relevant sewerage company to take responsibility for qualifying infrastructure they have constructed. The agreement and approved scheme documents remain specific to the development.
Share the site postcode, drawings and any approval notes and we can review the enquiry properly.
Request a review →Technical support
Before pricing or starting adoption-related construction, establish which documents are approved, which conditions remain open and who is responsible for design, construction, inspection coordination and evidence.
Share the site postcode, drawings and any approval notes and we can review the enquiry properly.
Request a review →Technical support
Translate the approved design into a clear delivery scope. Identify foul and surface water runs, manholes, connections, pumping stations, rising mains, access requirements and interfaces with other contractors before work starts.
Share the site postcode, drawings and any approval notes and we can review the enquiry properly.
Request a review →Technical support
Do not leave every record until the end. Photographs, levels, material information, test records, variations and inspection notes are easier to control when captured as the work progresses.
Share the site postcode, drawings and any approval notes and we can review the enquiry properly.
Request a review →Technical support
The final evidence pack should reflect the actual assets. Review CCTV observations, cleaning, test results, as-built drainage records, manhole information and inspection comments together so practical defects and missing documents are separated clearly.
Review survey and reporting support before inspection or handover.
View page →Organise drainage records and manhole information around the installed assets.
View page →Address practical inspection and close-out items supported by current evidence.
View page →Technical support
This checklist is an organising aid, not a substitute for the current approved guidance, the sewerage company's requirements, the executed agreement or professional design and legal advice.
Open the current Sewerage Sector Guidance appendices and approved documents.
View page →Read the regulatory explanation of the Code for Adoption Agreements.
View page →Send the available drawings, comments and programme for a practical scope review.
View page →Questions
Start with the agreement or application status, approved drainage drawings, drainage strategy, sewerage company comments, site postcode, programme and any inspection, CCTV, test or as-built records already available.
No. The agreement, approved design, asset types, sewerage company requirements and project stage determine what is required.
Yes. Send the comments with the drawings and available evidence so practical remedial, survey, testing and documentation needs can be separated.
Ready to review the project?
We can review drainage strategies, S104/S106 information, CCTV notes and adoption handover requirements.